This project required an efficient solution to be found as all works were conducted within a busy ground floor lobby live environment. The 6m high walls were cladded in reconstructed veneer finished in a clear polyurethane, constructed in a picture frame design.
Additionally, 4 levels of lift entrance walls were cladded with the same veneer wall panelling and a leather banquette seating.